The Masdar City 10MW Solar Photovoltaic Plant was the first grid-connected renewable energy project in the UAE and the largest of its kind in the Middle East when inaugurated in 2009.
The facility produces about 17,500 megawatt-hours of clean electricity annually and offsets 15,000 tonnes of carbon emissions per year. The plant consists of 87,780 multicrystalline and thin-film modules supplied by Suntech and First Solar.
Look for more details information in the link below
https://masdar.ae/en/Masdar-Clean-Energy/Projects/Masdar-City-Solar-Photovoltaic-Plant
Solar PV
2009
Ground-mounted ; On-Grid
Abu Dhabi
Operational
10 MW